TDI has a highly qualified Department of facilities whose team is composed of engineers, architects, technicians of prevention of risks, which unite their efforts for the realization of projects requested by our clients. This Department develops consulting projects as support for the realization of the facilities or their realization full from the customer’s requirements until the final validation by the testing laboratory accredited by the national accreditation entity ENAC.
TDI designs and manages three types of installation in the rehabilitation of the laboratory conditions existing or performing completely new lab:
In these cases an essential factor for protection is the application of negative differential pressure from outside. Optionally, you can establish a classification of air purity.
Phase 1. Determination of the requirements of the customer.
All the customer requirements for the implementation of project always focusing on two fundamental aspects such as the prevention of occupational hazards and work or products or use within the enclosure or room shall be collected at this stage.
Phase 2. Development of the project.
Our engineers, architects and technicians in occupational risk prevention study all customer requirements for the realization of the project facility to comply with all existing regulatory requirements local, national, and where appropriate if it is necessary to international.
Phase 3. Construction of the facility.
Once the project is approved by the customer he is planning with all phases of installation are informed to the client and the execution of the installation is done with highly skilled technicians in installation of rooms, air conditioning, air purification and all supervised by a Chief of installation.
Phase 4. Validation of the room.
It is the last phase of the installation and the most important of them all. In this phase the customer receives the validation report of the Room conducting the measurements are necessary to confirm the initial requirements of the customer. This phase will be performed by TDI testing that this accredited laboratory with the national accreditation entity ENAC, with full independence on the rest of departments.
Safety laboratory has a useful area of approximately 25 m2, and is located inside a container transport standard 12 m long by 2.7 m wide (standard measures, for easy handling and t […]
View moreThe project carried out in the Córdoba Transfusion Center consisted of adapting a part of the Center to configure the following rooms: Initial lock Locker room Final lock Work roo […]
View moreAfter a long process of studies of all the projects presented, TDI has been the successful bidder for the construction of two Gene Therapy laboratories in Seville and Córdoba. The […]
View moreAnimal facility installation starting from scratch in CNIC of MADRID. NATIONAL CENTER FOR CARDIOVASCULAR RESEARCH. The installation consists of connection to all the installations […]
View moreConstruction of a biological safety laboratory level P3 reduced to negative pressure (depression) for Brucellosis research, equipped with a lock / changing room for personnel also […]
View moreConstruction, in the department of microbiology of the Faculty of Medicine (Valladolid), of a laboratory for brucellosis in depression level P3 reduced. It was carried out from the […]