Safety laboratory has a useful area of approximately 25 m2, and is located inside a container transport standard 12 m long by 2.7 m wide (standard measures, for easy handling and transportation) with a useful internal height of 2.3 m. In it have been defined t […]
View moreThe project carried out in the Córdoba Transfusion Center consisted of adapting a part of the Center to configure the following rooms: Initial lock Locker room Final lock Work room Each of these rooms meets defined and detailed air purity conditions. A positi […]
View moreAfter a long process of studies of all the projects presented, TDI has been the successful bidder for the construction of two Gene Therapy laboratories in Seville and Córdoba. These laboratories will have the most sophisticated facilities for these purposes, […]
View moreAnimal facility installation starting from scratch in CNIC of MADRID. NATIONAL CENTER FOR CARDIOVASCULAR RESEARCH. The installation consists of connection to all the installations in modular exterior building. […]
View moreConstruction of a biological safety laboratory level P3 reduced to negative pressure (depression) for Brucellosis research, equipped with a lock / changing room for personnel also in depression. The object includes the division into 2 rooms with the same level […]
View moreConstruction, in the department of microbiology of the Faculty of Medicine (Valladolid), of a laboratory for brucellosis in depression level P3 reduced. It was carried out from the enclosure (walls, ceilings, floors, windows, doors, …), ventilation and air c […]
View more